CRTSⅢ Slab Ballastless Track Track Slab Prefabrication and Laying Technology
LiChangning DaiYu WangYaguo更新时间:2020-06-29 12:05:08
最新章节:References封面
版权信息
Brief Introduction of the Book
Preface
Foreword
1 Overview of CRTSⅢ Slab Ballastless Track Structure
1.1 CRTSⅢ Track Structure on Bridge
1.2 CRTSⅢ Track Structure on Subgrade
1.3 CRTSⅢ Track Structure in Tunnel
1.4 Construction Technology Process of CRTSⅢ Slab Ballastless Track
2 Prefabrication Production for CRTSⅢ Pre-tensioning Track Slab
2.1 Requirement for the Basic Structure of Prefabrication Yard
2.2 Tooling Equipment Allocation
2.3 Organization Management for Track Slab Construction
2.4 Material Management of Track Slab Prefrabrication Yard
2.5 Technological Process of CRTSⅢ Pre-tensioning Track Slab
2.6 Key Points of Construction for Pre-tensioning Track Slab
2.7 Quality Control
3 Construction of Concrete Base and Limit Groove
3.1 Technological Process of Base Construction
3.2 Key Points of Base Construction
3.3 Resource Allocation
3.4 Quality Control
4 Construction of Isolated Layer and Elastic Layer
4.1 Construction Technology Process
4.2 Key Points of Construction
4.3 Resource Allocation
4.4 Quality Control
5 Track Slab Layering and Fine Adjustment
5.1 Technological Process of Track Slab Layer and Fine Adjustment
5.2 Key Points of Construction
5.3 Resource Allocation
5.4 Quality Control
6 Construction of Self-compacting Concrete Structural Layer
6.1 Construction Technology Process of Self-compacting Concrete Structural Layer
6.2 Key Points of Construction
6.3 Resource Allocation
6.4 Quality Control
References
更新时间:2020-06-29 12:05:08